Green Design Sydney
Green Design Sydney
Unauthorised works · Straight answers

Unapproved work: what a Building Information Certificate actually does

If your house has work that was never approved, a Building Information Certificate is usually the way to fix it. Here is what it does, what it does not do, and what council will want to see.

A surprising number of Sydney homes have something on them that was never approved: an enclosed verandah, a converted garage, a granny flat that was a shed, a deck that grew. It usually surfaces when the property is sold, refinanced or insured, or when a neighbour complains. The tool for fixing it is a Building Information Certificate, often called a BIC.

What it does

A BIC is council saying, in writing, that it will not order the work to be demolished, altered or rebuilt for a set period because of the way it was built. It settles the question "will council make me pull this down?" for the matters the certificate covers. Buyers, lenders and insurers understand it and usually accept it.

What it does not do

It is not a retrospective approval of the use. If a converted garage is being rented out as a separate dwelling, the BIC deals with the building, not with whether a second dwelling is permitted on that block. Sometimes a BIC is enough on its own; sometimes it goes together with a development application for the use. That is the first thing we work out.

What council will want to see

  • A survey showing what is actually there and where it sits against the boundaries.
  • Drawings of the work as built, prepared by someone who knows what council is checking for.
  • Evidence that the work is structurally sound — usually a structural engineer's report.
  • Evidence on fire safety, waterproofing, and access where they apply.
  • Anything that shows the work meets, or can be brought to meet, the building code.

The honest part

Not everything can be kept. Work that sits over a boundary, blocks a required exit, or was built in a way that cannot be made safe may have to be changed before council will issue the certificate. We tell you that early, because finding it out after the fees are paid is the worst outcome. Most cases are fixable; the ones that are not are better known on day one.

How long does a Building Information Certificate take?
It varies by council and by how much evidence has to be gathered. Getting the survey, structural report and drawings together is usually the longest part.
Does a BIC approve a granny flat I built without approval?
A BIC deals with the building work, not the use. Whether the building can be used as a separate dwelling is a separate question and may need a development application.
Can I sell a house with unapproved work?
You can, but buyers, their solicitors and lenders often ask for a BIC, and its absence can affect the price or the sale.

Have a property in mind? Send us the address and what you want to do with it. The first conversation is free, and if the honest answer is "don't", we say so.

Ask about your property All straight answers